September 15, 2020

Decided today would be for working on the cabin ceiling. Since I started it before last winter I figured I better get it done before this winter. The cabin will stay warm much better with the ceiling lowered.

I started by cutting the bracing 2 x 4s to length with a 45 degree angle. It was then just a matter of wrestling the panels into place and screwing them in place. Then bracing the panels with the precut 2 x 4s. I got about half the ceiling done when the mail came.

I got my enhanced spring for my AR-15 in the mail. So I installed it and spent the rest of the day sighting it and my other guns in.

I’ll finish the ceiling tomorrow.

I hope.